关于铁路建设路基工程风险管理的探讨 被引量:4

Discussion on Railway Project Risk Management of Subgrade
在线阅读 下载PDF
导出
摘要 铁路路基需要重点防范的工程风险有路基沉降、路基上拱、路堤局部塌陷、路堑边坡坍塌等,建设过程中要结合工程实际进行风险识别、风险分析、控制措施制定、过程控制落实等风险管理。本文归纳总结了路基工程重要风险因素和控制措施,论述了各管理环节的管理方法和控制重点,并建议在铁路工程建设中实行常态化和规范化的风险管理。 The main risks for railway embankment projects risk prevention include subgrade settlement, roadbed arch, partial collapse of the embankment, road slope collapse, etc. During construction process, process control and other risk manage- ment like risk identification, risk analysis, control measures are needed in combination with construction practice. The article summarizes the important risk factors and control measures, discusses various aspects of the management and key control points and recommends the implementation of the normalization and standardization of risk management in railway construction.
作者 陈福
出处 《铁道建筑技术》 2014年第2期64-69,共6页 Railway Construction Technology
关键词 铁路路基 风险管理 控制措施 railway roadbed risk management control measures
  • 相关文献

同被引文献21

引证文献4

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部