摘要
结合新建金华至台州铁路工程磐安至里林站区间隧道内车站设置方案研究,对车站联锁、运输调度指挥、集中监测等信号系统方案进行了研究和探讨。
Combined with the study of station layout in the tunnel of the new railway project from Jinhua to Taizhou-Panan to Lilin section, the paper researches and discusses the signaling scheme of station interlocking system, transportation dis- patching command system and centralized monitoring system.
出处
《铁道建筑技术》
2014年第1期38-40,共3页
Railway Construction Technology
关键词
隧道
车站
信号系统
方案探讨
tunnel
station
signal system
scheme discussion