驳船绞锚在海洋管道后挖沟工程中的作用

Effects of Barge Anchor Line on Submarine Pipelines Post Trench
在线阅读 下载PDF
导出
摘要 通过对海底管道后挖沟作业过程的深入剖析,总结出锚机与后挖沟机相互协调的指挥方法,阐明了驳船绞锚的操作要领和注意事项。针对不同的地质条件和设计要求,提出合理高效的绞锚方式,从而避免海底管道后挖沟过程中后挖沟机对已铺设管道的破坏,并保证海底管道后挖沟的沟形和速度。 Operation process of submarine pipeline post trenching is deeply analyzed in this paper. The command method of the anchor windlass and post trencher intercoordination is summarized and operation essentials and attentions of the heaving operation are illustrated in this article. According to different geological conditions and design requirement, the reasonable and efficient methods' of heaving are put forward, in order to avoid the damage of the pipeline and ensure the molding effect and trenching velocity.
出处 《船舶标准化工程师》 2014年第2期53-55,共3页 Ship Standardization Engineer
关键词 海底管道 后挖沟 锚缆 submarine pipelines post trench anchor line
  • 相关文献

参考文献4

  • 1杨明华.海洋油气管道工程[M]天津:天津大学出版社,2011112-117.
  • 2陈刚.海洋工程设计手册:海上施工分册[M]上海:上海交通大学出版社,2013699-703.
  • 3国防科学技术工业委员会.中国造船质量标准[S],200524-28.
  • 4挪威船级社.海底管道系统规范[S],200031-35.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部