摘要
针对新钢公司四总降变XWJK-3100变电站综合自动化系统存在的问题,介绍其升级改造方案。
According to the problems of four main step-down transformer of XWJK-3100 substation integrated automation system in Xinyu Iron and Steel Co., LTD, the upgrade and transformation scheme are introduced.
出处
《自动化应用》
2014年第2期64-65,共2页
Automation Application
关键词
变电站综自系统
升级
改造
substation integrated automation system
upgrade
transformation