摘要
陕西省"十五"数字测震台网的建成并投入运行,极大地提高了陕西测震台网地震监测能力和地震速报能力,并成功地经受了四川汶川8.0级地震的考验。在2008年5月12日14时28分汶川8.0级地震后至5月31日,陕西测震台网速报地震669个,其中在地震速报规定范围内速报5级以上地震11个。在应对2009年11月5日陕西高陵4.4级地震(Ⅰ类速报地震)和2013年7月22日甘肃岷县6.6级地震(Ⅲ类速报地震)及余震序列时,两个主震各种速报参数偏差全部符合地震速报规定对相应类别地震速报的要求。
With operation of tenth rapid report has greatly improved five-year seismic network plan though Wenchuan earthquake in Shaanxi, monitoring ability and occurred. There were about 669 earthquakes reported by Shaanxi seismic network after Wenchuan earthquake in which about eleven earthquakes with Ms ≥5.0 from May 12^th to 31st ,2008. The parameter error of Gaoling earthquake with Ms4.4 on November 5th ,2009 and Min county earthquake with Ms6.6 on July 22^nd ,2013 meet the requirements of seismic rapid report rules.
出处
《内陆地震》
2014年第1期57-62,共6页
Inland Earthquake
基金
陕西省地震局中央财政汶川地震灾后恢复重建基金项目
关键词
陕西测震台网
地震速报
结果评估
监测能力
Shaanxi seismic network
Seismic rapid report
Result evaluation
Monitoring ability