摘要
针对秦皇岛港煤二期预留堆场皮带机控制系统的改造工作,从控制系统结构、PLC编程、上位控制系统以及工艺流程进行了介绍,为类似工程项目的实施提供了一种合理、可行、先进的解决方案。
Based on the transformation of belt control system in the yard of Qinhuangdao port,this study introduced the control system structure,PLC program,host control system and the technological process. This study provided a reasonable,feasible,and advanced solution for the implementation in similar projects.
出处
《港口装卸》
2014年第1期40-41,共2页
Port Operation