期刊文献+

高速铁路维修天窗安全作业门管理方式研究 被引量:4

Study on Management Mode of Safety Operation Door of Maintenance Window on High-speed Railways
在线阅读 下载PDF
导出
摘要 通过阐述高速铁路维修天窗安全作业门的分类和管理部门,结合我国典型铁路局作业门的相关规定,采用UML顺序图描述安全作业门申请流程中各单位间消息传递的时序关系,比较某高速铁路沿线各铁路局维修天窗安全作业门的钥匙管理和上、下线管理情况,分析作业门管理存在的主要问题,提出相应对策,重点对作业门监控管理系统的功能提出建议,对于统一我国高速铁路维修天窗安全作业门管理、优化综合维修天窗效率具有现实意义。 Through expounding classification of safety operation door of maintenance window on high-speed railways and its management department, combining with relative rules of typical railway administration operation door in China, this paper, by using UML sequence diagram, describes the time sequence relationships of information transmission among each enterprise during application process of safety operation door, compares the key management and line-into & line-out management status of safety operation door of the maintenance window by each railway administration along certain high-speed railway, analyzes main problems existing in the operation door management, puts forward corresponding countermeasures and emphatically presents suggestions on the functions of supervision management system of the operation door, all of these have actual meaning on unifying safety operation door management of maintenance window for Chinese hiclh-sDeed railways and oDtimizinQ efficiency of comprehensive maintenance window.
出处 《铁道运输与经济》 北大核心 2014年第3期51-55,共5页 Railway Transport and Economy
基金 铁道部科技研究重大课题(Z2012-059) 中国铁道科学研究院院基金(2013YJ105)
关键词 高速铁路 维修天窗 安全作业门 对策 High-speed Railway Maintenance Window Safety Operation Door Countermeasure
  • 相关文献

参考文献7

二级参考文献47

共引文献21

同被引文献37

  • 1万毅,邓斌,李会杰,田志军,柯坚.基于FTA的接触网系统可靠性研究[J].铁道工程学报,2005,22(6):55-59. 被引量:36
  • 2陈绍宽.铁道牵引供电系统维修计划优化模型与算法[D].北京:北京交通大学,2006.
  • 3Garg A, Deshmukh S G. Maintenance Management: Literature Review and Directions[J]. Journal of Quality in Maintenance Engineering, 2006, 12(3): 205-238.
  • 4Lim B O, Yu Y H. A Study of the Reliability Centered Maintenance(RCM) for the Korea Train eXpress(KTX) Vehicle[C/OL]//UIC. Congress Proceedings of the 7th World Congress on Railway Research(WCRR). Montreal: International Union of Railways, 2006[2015-11-20]. hap:// www.uic.org/cdrom/2006/wcrr2006/pdf/233.pdf.
  • 5Bae C, Koo T Y, Son Y T, et al. A Study on Reliability Centered Maintenance Planning of a Standard Electric Motor Unit Subsystem Using Computational Techniques[J]. Journal of Mechanical Science and Technology, 2009, 23(4): 1157-1168.
  • 6Bowler D J, Primrose P L, Leonard R. Economic Evaluation of Reliability-Centred Maintenance(RCM) ~ an Electricity Transmission Industry Perspective[J]. lET Proceedings- Generation, Transmission and Distribution, 1995, 142(1): 9-16.
  • 7Egan G T, Dillon T S, Morsztyn K. An Experimental Method of Determination of Optimal Maintenance Schedules in Power Systems Using the Branch and Bound Technique[J]. IEEE Transactions on Man and Cybernetics, 1976, 6(8): 538-547.
  • 8Chi Y L, Ferreira L, Ho T K, et al. Evaluation of Maintenance Schedules on Railway Traction Power Systems[J]. Journal of Rail and Rapid Transit, 2006, 220(2): 91 102.
  • 9Pham H, Wang H Z. Imperfect Maintenance[J]. European Journal of Operational Research, 1996, 94(3).. 425 438.
  • 10Park G P, Yong T Y. Application of Ordinal Optimization on Reliability Centered Maintenance of Distribution System[J]. European Transactions on Electrical Power, 2011, 22(3):391 401.

引证文献4

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部