3J.Ciurana, M.L.Garcia-Romeu, I.Ferrer, et al. A model for integrating process planning and production planning and control in machining processes[J].2008, 24(4):532-544.
4M. HOU, T. N. FADDIS. Automatic tool path generation of a feature-based CAD/CAPP/CAM integrated system[J]. Intemational Journal of Computer Integrated Manufacturin g,2006,19(4):350-358.