5Nandor Tamaskovics,Hans-Jorg Meinig.Dynamic excitation of transported materials on belt conveyors[J].World of Mining,2004(2):105-114.
6Veeraswamy V,Reddy A R P.Selection and installation of belt conveyors at no.21 incline:Yellandu a case study[J].Journal of Mines,2004(1/2):3-5.
7Fu Junqing,Wang Cong,Li Yujin.Optimal driving of large belt conveyor with multi-roller variable-frequency drive[J].J.China Univ.of Mining&Tech.(English Edition),2004,14(2):231-237.
8Lodewijks G.Strategies for automated maintenance of belt conveyor systems[J].Bulk Solids Handling,2004,24(1):16-22.
9Li Guangbu.Belt conveyor dynamic behavior and associated problems[J].Bulk Solids Handling,2003,23(5):322-327.
10Lodewijks G.The netherlands determination of rolling resistance of belt conveyors using rubber data:fact or fiction[J].Bulk Solids Handing,2003,23(6):384-391.