S-lay型和J-Lay型铺管船的功能扩展研究 被引量:12

Research on the Functions Enlargement of S-lay and J-lay Vessel
在线阅读 下载PDF
导出
摘要 铺管船除了具备管道铺设功能以外,还应该具备管道弃置回收作业以及安装水下生产设施(如PLET)的功能。介绍了使用J型铺管船来进行管道铺设、弃置回收及水下生产设施安装的过程。基于J型铺管方法设计了一套多功能水下生产设施安装系统,以解决S型铺管船不具备安装水下生产设施能力的问题,并扩展了J型铺管船的相关功能。结合设计的多功能水下生产设施,提出了铺管船使用此套装置来安装水下生产设施的步骤,对南海的管道铺设和水下生产设施安装具有指导意义。 Besides the function of pipe-laying,the pipe-laying vessels are to have other functions, such as recovering and abandonment of pipelines,installation of SPFs (subsea production facili-ties),et al.J-lay vessels are usually constructed with these functions and corresponding proce-dures are introduced in the first part of the paper as conducting these processes,and then a multi-functional SPF installation system,which is designed based on the concept of J-Lay mode,is de-veloped.This system enables the S-Lay vessels to have the ability to install SPFs and also could expand the capability of J-Lay vessels.Combining with the designed system,corresponding proce-dures for SPFs’installation are proposed.The designed system and proposed procedures in this paper could provide guidance for the installation of pipelines and SPFs in SCS.
出处 《石油矿场机械》 2014年第2期7-14,共8页 Oil Field Equipment
基金 国家重点基础研究发展计划(973计划)"深海柔性结构的非线性流固耦合振动与破坏机理"(2011CB013702) 国家科技重大专项"深水铺管起重船及配套工程技术"(2011ZX05027-002)
关键词 铺管船 水下生产设施 安装 管道弃置回收 pipe-lay vessel subsea production facilities installation system abandon &amp recovery of pipeline
  • 相关文献

参考文献25

  • 1Perinet D, Frazer I. J-Lay and Steep S-Lay: Comple- mentary Tools for Ultradeep Water MS-P[C]//The 2007 Offshore Technology Conference. Houston, Tex- as,U. S. A. 2007.
  • 2Jiang X Z,Li Z G.. A New Lifting System for Installa- tion of Risers in Deeper Water[C]// Proceedings o{ ISOPE-14IDOT, Beijing, China, June 28-July l, 2009 : 36 42.
  • 3Duan M L. A Lifting System for Installation of Deep- water Risers and Subsea Hardware[C]// invited pres- entation for the 2010 SUT techn{cal conference. 2010.
  • 4Duan M L,Wang Y, Estefen S. An Installation system of Deepwater Risers by an S-lay Vessel[J]. China O eean Engineering,2010,24(4) :139-148.
  • 5Hebert C. West Seno Facilities and Pipelines, Using Conventional Vessels for Deepwater Installation[C]// Offshore Technology Con{erence, Houston, Texas, U. S. A. 2004.
  • 6Heerema E P. Recent achievements and present trends in deepwater pipe-lay systems[C]// OffshoreTeehnol- ogy Conference, Houston, 2005 .. 17627.
  • 7王孙,甘丰录.我国首艘3000米深水铺管船出坞[N].中国船舶报,2010—06—02(2).
  • 8程峰.2×8000t半潜起重铺管船铺管系统研究[J].船舶,2012,23(1):71-75. 被引量:6
  • 9Cavicchi M, Ardavanis K. J-lay Installations Lessons Learned[R]. OTC 15333 : 1-11.
  • 10管德旺,段梦兰,何宁,杨伟.深水管道J形铺设工艺分析[J].石油机械,2011,39(10):131-135. 被引量:5

二级参考文献23

  • 1周俊.深水海底管道S型铺管肜态及施工工艺研究[D].杭州:浙江大学,2008.
  • 2Cavicchi M. J lay Installations I.cssons Learned[R]. OTC 15333,2003.
  • 3Stelios Kyriakides, Edmundo Corona. Mechanics of Off shore Pipelines Vol. I Buckling and Collapse[M]. Ox ford : Elsevier BV, 2007 : 40-43.
  • 4方轼红.国外海底管道建造技术述评.海洋技术,:83-85.
  • 5方维章.国外海底管线的铺设和开沟埋管技术.海洋工程,:82-84.
  • 6段梦兰.深水油气开发工程共用技术平台的研究报告[R].北京:中国石油大学(北京),2010.
  • 7Harry van der Heijden, Peter Butler. Installation of an Internally Clad Pipeline Using the J-Lay Method[R]. OTC 7016,1992.
  • 8Benton F. Baugh. ERECTOR FOR J LAY PIPE LAYING SYSTEM : US, 006910848B1 [P]. 2005-06-28.
  • 9ROODENBURG,Joop. MARINE J LAY PIPELAYING SYSTEM:EP,1779013B1[P]. 2008-05-28.
  • 10Datta T K. Abandonment and recovery solution of subma- rine pipelines [ J ] . Applied Ocean Research, 1982, 4 (4): 247-252.

共引文献31