摘要
在分析乌鲁木齐铁路枢纽概况的基础上,为适应"一轴三翼,双核多心、三带三楔、八大分区"的空间结构和中长期铁路网规划的要求,对乌鲁木齐铁路枢纽总图规划进行调整和优化,从客运量和货运量2个方面对枢纽客货运量进行预测,结合客运系统、货运系统、机务与车辆设备及解编系统等多方面规划提出乌鲁木齐铁路枢纽规划方案。
Based on analyzing the status of Urumqi railway hub, and in order to adapt to the demands of space structures of "one axle with three wings, double cores with multi centers, three belts with three wedges and 8 major sub-regions" and the middle-term & long-term railway network plan, the general layout planning of Urumqi railway hub is adjusted and optimized. This paper takes forecast on the hub traffic volume from 2 aspects of passenger traffic volume and freight traffic volume, and puts forward Urumqi railway hub planning scheme by combining with passenger transport system, freight transport system, locomotive service and rolling stock equipments as well as uncoupling system.
出处
《铁道运输与经济》
北大核心
2014年第2期4-10,共7页
Railway Transport and Economy
关键词
乌鲁木齐铁路枢纽
规划
客运系统
货运系统
Urumqi Railway Hub
Planning Scheme
Passenger Transport System
Freight Transport System