摘要
云南龙江水电站进水口在施工中采用滑模施工,对混凝土体形结构复杂、施工难度大、技术要求高的重点、难点突出部位的施工工艺和程序提出了具体的措施,不仅大大提高了施工进度,而且提高了施工质量。
Slip form technology is adopted during water intake construction of Longjiang Hydropower Station in Yunnan Province. Specific measures are worked out, such as construction technique and procedure for major and difficult parts, especially those with different concrete shapes and structures and high technical requirements. It is helpful for satisfying not only the time schedule but also the quality of construction.