期刊文献+

基于Quest的某船厂生产流程仿真研究 被引量:2

Process simulation of a shipyard based on Quest
在线阅读 下载PDF
导出
摘要 以江苏某船厂生产的36 m拖船为依托,依据生产计划驱动仿真模型,运用仿真软件Delmia/Quest及其二次开发技术实现了多船并行的生产流程虚拟仿真,通过对仿真结果进行分析,确定厂区生产瓶颈,并提出两种解决方案,选取设备利用率、生产线的平衡以及产出能力3个系统评价指标对厂区设备资源进行合理配置改进,最终确定最优配置方案,消除了生产流程中存在的瓶颈环节,实现了降低风险与成本、最大化生产效率的目的,不仅为船厂制造和管理提供了一个虚拟的、用于验证最佳的制造流程协同开发环境,也为仿真技术在船舶制造业中的应用提供了有效实例. Based on the 36 m tugboat of a shipyard in Jiangsu , a simulation model was derived according to the production plan , virtual simulation of many ships built together was done by using the Delmia /Quest and second development technology , the productive bottleneck was figured out , and two solutions were put forward .Choosing selection of equipment utilization , balance of the production line and capacity as the evaluation index , the re-source configuration was made rational , optimum scheme was determined , the bottleneck existing in the produc-tion process link was eliminated , production risk and cost was reduced , the product efficiency was maximized , providing not only a virtual collaborative development environment that was used to verify the best process for manufacturing and management , but also a valid instance for the application of simulation technology in the ship manufacture .
出处 《江苏科技大学学报(自然科学版)》 CAS 2013年第6期602-607,共6页 Journal of Jiangsu University of Science and Technology:Natural Science Edition
关键词 数字化造船 Quest二次开发 流程仿真 digital shipbuilding secondary development of Quest process simulation
  • 相关文献

参考文献7

二级参考文献35

共引文献33

同被引文献10

  • 1马健萍,周新建,潘磊.基于Delmia/QUEST的数字化装配线仿真应用[J].华东交通大学学报,2006,23(2):125-128. 被引量:25
  • 2Singh S P,Singh V K.An improved heuristic approach for multi- objective facility layout problem[J].International Journal of Production Research,2010,48 (4): 1171 - 1194.
  • 3W.Wang,B.Wu,Y.Hu.Vitrual simulation applications in manufacturing process of high-speed trains[J].Advanced Materials Research,2013,(622-623):575-580.
  • 4EI-Kilany K S,Young P,EI Baradie M A.Generic tool for modeling and simulation of semicondouctor in trabay material handling system[J].Journal of materials processing technology,2004,155:1927-1934.
  • 5Singh S P,Singh V K.An improved heuristic approach for multi- objective facility layout problem[J].International Journal of Production Research,2010,48 (4): 1171 - 1194.
  • 6W.Wang,B.Wu,Y.Hu.Vitrual simulation applications in manufacturing process of high-speed trains[J].Advanced Materials Research,2013,(622-623):575-580.
  • 7EI-Kilany K S,Young P,EI Baradie M A.Generic tool for modeling and simulation of semicondouctor in trabay material handling system[J].Journal of materials processingtechnology,2004,155:1927-1934.
  • 8周尔民,郑亚波,彭小剑.基于Quest的生产线资源优化研究[J].制造业自动化,2012,34(15):19-21. 被引量:4
  • 9屈鹏,管在林,邵新宇.基于Quest的车间物流规划与仿真研究[J].物流科技,2013,36(1):5-9. 被引量:6
  • 10吕坚,孙林岩,肖忠东,顾元勋.中国制造企业核心能力分析与评价[J].科研管理,2002,23(3):7-13. 被引量:20