摘要
本文对建国以来的工程质量管理模式分四个阶段作了概述。对前阶段“施工监理时期”存在的问题作了分析 ,并对当前“综合控制时期”实施“企业自控、社会监理、政府监督、用户评价”
The paper describes briefly the mode of quality management of engineering projects according to four stages since the founding of our People's Republic. The preceding stage was named as “construction supervision period”, and the existing problems in that period are analyzed. The present stage is named as “synthetic control period”, in which a supervision and guarantee system for construction quality will be put into effect. The contents of this system will include the self control of the enterprise, social supervision, national control and user's evaluation. In present stage, the problems which should be taken into attention, as well as the specific division of labour for different departments, are also expounded in detail.
出处
《铁道工程学报》
EI
2000年第4期123-126,共4页
Journal of Railway Engineering Society