摘要
20 0 0年中期 ,由奥钢联提供的第二座 FINMET○R粉矿还原厂在委内瑞拉奥尔达斯港进行试生产。第一座粉矿还原厂于 1999年在澳大利亚海德兰港 BHP DRI公司投产 ,并成功地将第一年产量预售给了东南亚地区 ,这主要是由于该地区对热压块铁的需求增加。目前 ,该厂正在集中力量对年产 2 0 0万 t的 4组设备其中之一进行调整 ,以使操作保持稳定。
As of mid 2000 the second VAI supplied FINMENT ○R fine ore reduction plant is under commissioning at Puerto Ordaz,Venezuela The first one was started up last year at BHP DRI, Port Hedland/Australia. BHP's success in forward selling the first year of output to Southeast Asian mills underlines the demand for the hot briquetted iron product Presently, work at Port Hedland is concentrating on stabilizing conditions in one of the four trains of the two million t/a plant
出处
《钢铁》
CAS
CSCD
北大核心
2000年第12期13-15,共3页
Iron and Steel