期刊文献+

3下综放工作面缩面改造的实践与应用 被引量:1

Practice and Application of 3 Fully Mechanized Top Coal Caving Surface Transformed into Shrinking Surface Reconstruction
在线阅读 下载PDF
导出
摘要 该文主要介绍了枣矿集团田陈煤矿3下7108综放工作面缩面改造的方法和步骤,成功解决了因受断层影响造成工作面反刀把式布置的回采缩面难题,保证了工作面的合理布置和不规则工作面缩面系统改造的高效完成。田陈煤矿3下7108工作面为躲避断层,工作面采用了非常规型布置,为保证生产接续问题,决定工作面在由里向外回采过程中,数次进行工作面若干切眼的合茬对接和缩面改造,实现了连续生产。今介绍其中一次缩面改造的方案。 The article mainly introduced the transformation methods and steps of 3 fully mechamzed top coal cavmg surtace in Tian Chen Coal Mine, Zaozhuang Mining Group, successfully solved the problem caused by mining working face anti Dao arrangement of shrinking face problems, to ensure the efficient completion of rational layout of working face and irregular face shrinking face system. Tian Chen coal mine 3 working face under 7108 is avoid fault, with unconventional arrangement of working surface. In order to ensure the production, mining the working face from the inside to the outside, several working face several close end butting eye and shrinking of the surface modification, realizes continuous production. A shrinking surface modification scheme was introduce in the article.
出处 《价值工程》 2014年第7期55-56,共2页 Value Engineering
关键词 综放工作面 缩面改造 工艺 提高工效 fully mechanized top-coal caving surface shrink surface modification technology promote work efficiency
  • 相关文献

参考文献3

二级参考文献3

共引文献3

同被引文献3

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部