棉花滩碾压混凝土重力坝设计要点 被引量:2

Some Focuses in Design of Mianhuatan RCC Gravity Dam
在线阅读 下载PDF
导出
摘要 正在施工的棉花滩水电站大坝为碾压混凝土重力坝 ,最大坝高 1 1 1 m,坝顶全长 30 0 m,共分 6个坝段 .本文就碾压混凝土重力坝的设计要点作了介绍 ,内容包括坝体总体布置、稳定应力分析、横缝设置、防渗结构、混凝土设计、温控措施及坝体可靠度分析等 .文中内容为施工详图设计阶段的资料 。 The Mianhuatan RCC Gravity Dam under construction has a maximum. height of 111 m and crest length of 300 m, involving 6 monolithes. This article presents some focuses of Mianhuatan Dam design, such as general layout, stability & stress analysis, transverse joint arrangement, impervious structure, concrete design, temperature control measures, dam reliability analysis and so on. The contents in the article only deal with construction drawings in design stage, not involving the changes in the cause of the construction.
出处 《水利水电技术》 CSCD 北大核心 2000年第11期32-35,共4页 Water Resources and Hydropower Engineering
关键词 碾压混凝土重力坝 断面设计 横缝 防渗 可靠度 RCC gravity dam, cross section design, transverse joint, seepage control, temperature control, reliability
  • 相关文献

同被引文献6

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部