用于工业部件放样与检测的特高精度工业测量3维控制网的建立 被引量:23

Establishment of 3-D Control Network with Extra-high Accuracy for Inspecting and Setting out of Industrial Components
在线阅读 下载PDF
导出
摘要 报道建立高精度的工业测量 3维控制网 ,采用整网的全站仪联机作业以对批量的大型工业部件进行放样与检测的全过程。在精度、可靠性、工效以及毋须建立“放线”平台费用等方面本系统有明显的实用意义。所建系统较之国外的“3维测量系统”在速度、控制面积以及精度保证上亦有明显优点。 An industrial control network with high accuracy should be established for measurement and setting out of batch of industrial components. The operation with online Total Stations on observation pillars has the advantages over one on tripods in velocity, accuracy and reliability. The platform must not be build for setting out . An industrial control network with 8 reinforced concrete observation pillars has been established in the steel structure workshop of the Baoji Bridge Plant in Shaanxi province. The directions of each station were obtained with PowerSet Total Station (2″)made by Sokkia CO.LTD., Japan,observing 3 observation sets. The 4 sides in the network were observed with a 3m invar levering staff served as 'transverse baseline' and the Total Station. The network has the size of 6m x 18m, the average side of about 6m, and the determination accuracy of ±0.10 mm for horizontal positions and of ±0.05 mm for vertical positions have been obtained. The determination method of side was discussed, and evaluation of the accuracy of side was performed. The network has been successfully used to set out the components of the Yangtze River bridge in Wuhu city , Anhui province.
出处 《测绘学报》 EI CSCD 北大核心 2000年第4期362-368,共7页 Acta Geodaetica et Cartographica Sinica
关键词 精度 工业部件 放样 检测 三维控制网 工业测量 extra high accuracy control network industrial components on line setting out
  • 相关文献

参考文献3

二级参考文献11

共引文献32

同被引文献81

引证文献23

二级引证文献124

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部