摘要 金川水电站导流洞进口边坡开挖过程较为复杂,坡体开挖部分岩性较差且有多组结构面发育,部分区域为强风化强卸荷岩体,为保障边坡安全稳定、节约边坡治理成本需合理优化锚固措施。为此,结合极限平衡法、二维和三维有限元法,从位移、应力、塑性区和稳定性多角度对初拟锚固方案的支护方式、锁口锚索与锚筋桩的设置、预应力锚索数量进行优化分析。结果表明,初拟方案下开挖边坡的各项安全指标均在合理范围内,其锚固措施是可行有效的。 The diversion tunnel inlet slope of Jinchuan Hydropower Station has a complex excavation condition. "Fhere are groups of structural planes in the excavating rock mass which has poor lithology and partial region is strong weathe- ring and unloading rock mass. Reasonable optimized anchoring measures have important significance to ensure the slope stability and cost saving for treating slope. In this article, combination of limit equilibrium method, two-dimensional and three-dimensional finite element method is used to optimize support pattern, setting of lock anchor cable and anchor bars, pre-stressed anchor cable quantity from the aspects of displacement, stress, plastic zone and stability. The results show the safety indexes of excavated slope with preliminary scheme are in a reasonable range and the anchoring measures are feasible and effective.
出处 《水电能源科学》 北大核心 2013年第12期147-150,共4页 Water Resources and Power
基金 湖北省教育厅科学技术研究计划优秀中青年人才基金资助项目(Q20111203) 湖北省宜昌市科学技术研究与开发基金资助项目(A2012-302-01) 三峡大学硕士学位论文培优基金资助项目(2013PY003)
关键词 边坡 开挖 锚固 二维有限元法 三维有限元法 极限平衡法 slope excavation anchoring two-dimensional finite element method three-dimensional finite elementmethod limit equilibrium method
  • 相关文献

参考文献8

二级参考文献36

共引文献54

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部