摘要 针对佛山电力局500kV罗洞变电站#4主变投运以来,由于运行环境、系统环境等因素的影响,主变噪声水平随着并联电容器组投入组数的增加而明显升高,部分测点在投入一组电容器组后即超过额定最大噪声值。本文针对此现象制定了周密详细的噪声及谐波电流测试方案,结合实测数据和理论分析,找出造成此现象的真正原因。 Since the operation of #4 transformer in 500kV Luodong substation of Fosan power bureau, and due to the influence of operation environment and system conditions, the noise level of transformer increases with the number of operating shunt capacitors. The noise level at some measuring points exceeds the rated max noise even when only one group of capacitor is running. This paper has established elaborate and detailed test schemes for noise and harmonic current, and has found the underlying reason for the issue with measuring data and theoretical analysis.
出处 《电测与仪表》 北大核心 2013年第11期32-36,共5页 Electrical Measurement & Instrumentation
基金 中国南方电网有限责任公司佛山供电局科技项目(1307050912238)
关键词 变压器 并联电容器 谐波电流 测试 transformer shunt capacitors harmonic current measurement
  • 相关文献

参考文献10

二级参考文献49

共引文献139

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部