期刊文献+

无拍卖的动态Agent调度模型 被引量:6

Dynamic Agent scheduling model without contract net protocol
在线阅读 下载PDF
导出
摘要 为寻找更有效率的动态Agent调度方法,提出一个不使用合同网机制的多Agent流式调度模型;与通过拍卖实现动态调度不同,模型将机器的工时以流的形式提供给作业Agent进行选择。该模型很好地规避了合同网模型在调度时因投标并发操作导致调度质量下降的问题,同时大大减少了所需的网络通信资源,提高了调度效率。模型还在资源Agent的运算过程中增加了优化模块,在保证调度软实时性的前提下提高了调度质量。通过实时仿真测试验证了流式调度模型的效果。 To search the more efficient scheduling method for dynamic Agent,a multi-Agent torrent scheduling model without employing contract-net-protocol was proposed.Different from the dynamic scheduling with public bidding,the machines' man-hours were formed as torrent by model for job Agent to choose.It evaded scheduling quality reduction leaded by concurrent-tendering operation of contract-net-protocol's scheduling,and reduced resource demand for inter-agents communication on the other hand.An optimizing module was introduced into the model,which could improve the allocation of machine time on jobs.The simulation test results validated the effectiveness of the proposed model.
作者 赵良辉
出处 《计算机集成制造系统》 EI CSCD 北大核心 2013年第11期2893-2899,共7页 Computer Integrated Manufacturing Systems
基金 广东省自然科学基金资助项目(8452902001001552)~~
关键词 流式调度模型 合同网模型 多AGENT系统 动态调度 torrent-type scheduling model contract-net-protocol model multi-Agent system dynamic scheduling
  • 相关文献

参考文献3

二级参考文献32

  • 1黄洪钟,李丽,刘伟.并行工程中设计任务的动态调度[J].机械工程学报,2002,38(z1):164-167. 被引量:12
  • 2任东锋,方宗德.并行设计中任务调度问题的研究[J].计算机集成制造系统,2005,11(1):32-38. 被引量:18
  • 3JIANG Pingyu,ZHOU Guanghui,ZHAO Gang,et al.E-2-MES:an e-service-driven networked manufacturing platform for extended enterprises[J].International Journal of Computer Integrated Manufacturing,2007,20(2/3):127-142.
  • 4ZHOU Guanghui,JIANG Pingyu,ZHANG Guohai.Game theoretical framework for process plan decision of jobs in networked manufacturing[C]//Proceedings of the IEEE International Conference on Automation and Logistics.Piscataway,NJ USA:IEEE,2007:1868-1873.
  • 5SAKAWA M,MORI T.An efficient genetic algorithm for job-shop scheduling problems with fuzzy processing time and fuzzy due date[J].Computers & Industrial Engineering,1999,36(2):325-341.
  • 6MATTFELD D C,BIERWIRTH C.An efficient genetic algorithm for job shop scheduling with tardiness objectives[J].European Journal of Operational Research,2004,155(3):616-630.
  • 7YUN Y S.Genetic algorithm with fuzzy logic controller for preemptive and non-preemptive joh-shop scheduling problems[J].Computers & Industry Engineering,2002,43(3):623-644.
  • 8KIM B H.A new game-theoretic framework for maintenance strategy analysis[J].IEEE Transactions on Powet Systems,2003,18(2):698-706.
  • 9ALI R Y.An effective hybrid immune-hill climbing optimization approach for solving design and manufacturing optimization problems in industry[J].Journal of Materials Processing Technology,2009,209(6):Z773-2780.
  • 10SRINIVAS M,PATNAIK L M.Adaptive probabilities of crossover and mutation in genetic algorithm[J].IEEE Tram on Systems,Man and Cybernetics,1994,24(4):656-667.

共引文献16

同被引文献68

引证文献6

二级引证文献41

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部