摘要
围绕"滨海4井"为代表的海上高温高压井联作测试,就以往高温高压井施工概况,井下管柱问题及改进地面设备、流程的重新认识,如井控安全、措施作业,井口控制等方面进行探讨,并对存在问题提出相关对策。
Focus on the coastal of 4 well represented by combined testoperation forhigh temperature and high pressure Wells at sea,the former construction situation of the high temperature and high pressure Wells,problems of down-hole string and improved the surface equipment and their process are studied again,measures such as well control safety,homework,wellhead control are discussed,and the relevant countermeasures to existing problems are put forward.
出处
《油气井测试》
2013年第5期41-44,77,共4页
Well Testing
关键词
高温高压
联作测试
问题
措施
high temperature and high pressure,combined operation of test,problem,measures