文章以山东省菏泽市第二人民医院门诊病房楼的拆建工程为例,介绍该医院采用整体规划、分期实施的设计构思,分享对旧院区进行拆建改造设计的经验,以供其他改造的医院参考。
The article takes Heze Second People's Hospital outpatient ward building reconstruction for example, explains the old hospital reconstruction design by following the design concept of master planning, phasing and based on the actual situation; Gives reference to similar projects.