预应力锚索抗滑桩在两河口水电站场平工程中的优化设计 被引量:1

Optimal Design of Prestressed Anchor Rope and Anti-slide Pile in Changping Project of Lianghekou Hydropower Station
在线阅读 下载PDF
导出
摘要 四川雅砻江两河口水电站西地220kV变电站场平工程,其位置布置在距工程坝址下游5km的右岸4。公路K2+500一K2+600处,工程主要在该区域建造一个84m~28nl场地,用于后期机电设备的安装;原设计是将边坡分级开挖支护后形成场地,但由于该地区属于青藏高原的雅砻江河谷地带,两岸边坡山高坡陡,其开挖工程量大,边坡下有地方公路其来往车辆及行人较多,边坡开挖过程中存在很大的安全隐患,同时由于工程施工用电的急切需要,因此业主对该场平项目工期要求很紧,根据以上要求,经反复论证最终采用预应力锚索与抗滑桩相结合的优化设计。 The 220 kV substation Changping project of Lianghekou hydropower station on the Yalongjiang River is located at Chainage K2+500-K2+600 of No.4 road,5 km downstream of the dam site.It aims to build a yard of 84 mx28 m for later erection of electro-mechanical equipment.In the original design,it is formed by steps excavation and supporting of the slope,while this area belongs to Yalongjiang valley of Qinghai-Tibet Plateau,slopes on both banks are steep with large excavation,and there are many vehicles and pedestrians passing the road every day,it exists large potential security risk during slope excavation;at the same time,due to pressing need of construction power,and the Employer has urgent requirement on the construction period of the project,therefore,optimal design of prestressed anchor rope and anti-slide pile is adopted after iterative demonstration.
作者 许晓忠
出处 《水利水电工程设计》 2013年第4期4-5,33,共3页 Design of Water Resources & Hydroelectric Engineering
关键词 预应力锚索 抗滑桩 优化设计 两河口水电站 prestressed anchor rope anti-slide pile optimal design Langhekou hydropower station.
  • 相关文献

同被引文献9

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部