摘要
分析了宁海发电厂1 000 MW机组自投产以来风烟系统存在的问题,给出了问题的解决方法,提高了机组运行的稳定性和经济性。
This paper analyzes problems of flue gas system in 1 000 MW units of Ninghai Power Plant since the operation, and it gives a solution to the problem and improves the stability and economical efficiency of units operation
出处
《浙江电力》
2013年第10期38-40,69,共4页
Zhejiang Electric Power