文章主要介绍三峡工程永久船闸中六输水洞的开挖爆破对邻近的南六、北六闸首新浇混凝土影响的震动控制情况 ,并对爆破震动监测。
To Control the effect of ground vibration on the freshly-casted concrete body of Southern and Northern 6th lock head during rock excavation of Middle 6th transportation tunnel of permanent ship-lock in the Three Gorges Project is introduced and the problems such as vibration monitoring, data analysis and information feedback,etc.are also discussed. [
出处
《爆破器材》
CAS
北大核心
2000年第6期28-31,共4页
Explosive Materials
基金
国家电力公司学科建设资助项目(合同号:SPKJ016-02)
关键词
三峡工程
新浇混凝土
爆破震动
控制
Three Gorges Project,freshly-casted concrete body,ground vibration control