5Beccali M,Cellura M,Lo Brano V. Forecasting daily urban electric load profiles using artificial neural net-works[J].Energy Conversion and Management,2004,(18-19):2879-2900.
2Garey M R, Johnson D S, Sethy R. The complexity of flow shop and job shop scheduling. Mathematics of Operations Research, 1976, 1(2): 117-129.
3Dimopoulos C, Zalza A M S. Recent developments in evolutionary computation for manufacturing optimization: problems, solutions, and computations. IEEE Transactions on Evolutionary Computation, 2000, 4(2): 93-113.
4Valente J M S, Alves R A F S. An exact approach to early/tardy scheduling with release dates. Computers and Operations Research, 2005, 32(11): 2905-2917.
5Yang Q Y, Sun J G, Zhang J Y, Wang C J. A hybrid discrete particle swarm algorithm for open-shop problems. In:Proceedings of the 6th International Conference on Simulated Evolution and Learning. Hefei, China: Springer, 2006. 158-165.
6He S, Wu Q H, Wen J Y, Saunders J R, Paton R C. A particle swarm optimizer with passive congregation. Biosystems. 2004, 78(1-3): 135-147.
7Kao Y T, Zahara E, Kao I W. A hybridized approach to data clustering. Expert Systems with Applications: An International Journal, 2008, 34(3): 1754-1762.
8Rameshkumar K, Suresh R K, Mohanasundaram K M. Discrete particle swarm optimization algorithm for permutation flowshop scheduling to minimize makspan. In: Proceedings of International Conference on Advances in Natural Computation. Changsha, China: Springer, 2005. 572-581.
9Lian Z G, Gu X S, Jiao B. A similar particle swarm optimization algorithm for permutation flowshop scheduling to minimize makespan. Applied Mathematics and Computation, 2006, 175(1): 773-785.
10Nearchou A C. The effect of various operators on the genetic search for large scheduling problems. International Journal of Production Economics, 2004, 88(2): 191-203.