摘要
目的探讨Solitaire支架取栓术治疗急性缺血性脑卒中的手术配合要点。方法对30例采用Solitaire支架行急症介入取栓术的手术配合进行总结。结果 30例采用Solitaire支架行急症介入取栓术的患者血管开通率达93.3%。术中护士、技师与手术医师配合良好。生命监护操作及记录良好,无手术器械递送错误;影像资料记录完整。结论器械护士周密的术前准备和熟练的术中配合是保证顺利完成急诊介入手术的关键环节。巡回护士的全程心电监护对顺利完成急诊介入手术起到了重要作用。
Objective To discuss the key points of nursing cooperation with the performance of Solitaire stenting removal of thrombus for the treatment of acute ischemic stroke. Methods A total of 30 cases with acute ischemic stroke underwent emergency interventional operation. Solitaire stenting removal of thrombus was carried out in all patients. The experience of nursing cooperation was retrospectively summarized. Results Emergency Solitaire stenting to remove the thrombus was successfully performed in 30 patients with acute ischemic stroke. The vascular re-canalization rate was 93.3%. In performing the operation, the nurses and technicians cooperated with the operator well. The monitoring of vital physical signs was well manipulated and recorded. No misdelivering medical instruments occurred. Intact imaging data were successfully obtained. Conclusion Careful preoperative preparation by instrument nurses and skilled cooperation with the surgical performance are the key points to ensure a successful emergency interventional procedure. The whole-course EKG monitm'ing also plays an important role in accomplishing the operation.
出处
《介入放射学杂志》
CSCD
北大核心
2013年第10期868-870,共3页
Journal of Interventional Radiology
关键词
急性缺血性脑卒中
取栓术
支架
手术配合
acute ischemic stroke
removal of thrombus
stent
surgery cooperation