摘要
本文阐述二滩电站561MW水轮机参数选择,转轮、蜗壳、吸水管等主要通流部件的水力设计与试验,并介绍了若干研究成果。
This paper presents the parameter selection on 561MW francis turbine for Ertan Power Plant. The research results, hydraulic design and performance test of main components including runner, spiral casing, draft etc are introduced.
出处
《东方电气评论》
1991年第4期195-201,255,共7页
Dongfang Electric Review