摘要
巴家嘴水库由于淤积严重 ,虽对坝体进行两次加高 ,并增开泄洪洞 ,但目前所余库容已不足防御校核标准洪水 ,属病险库。如何使该库既能继续为当地兴利 ,又能减少黄河泥沙 ,是除险加固应遵循的原则 ,应进行多种方案比较。黄河支流水库多建于 2 0世纪 5 0~ 70年代 ,目前这些水库普遍存在淤积量大、防洪库容不足的问题 ,应在调查研究基础上 。
Because of serious sedimentation, Bajiazui reservoir is now in dangers without enough capacity storage for checked standard flood prevention even though the dam body has been raised and strengthened twice and also an additional flood discharge tunnel constructed. The principle for its risk elimination and solidification is how to make the reservoir continuously not only bring about benefit to local people but also reduce sediment into the Yellow River, therefore, multi plan comparison should be applied. Most reservoirs on the Yellow River branches are built in 1950s to 1970s,there are generally issues of intense sedimentation and lack of storage capacity for flood prevention currently existing with them. Thus, plans for risk elimination and solidification should be made according to specific situations and based on investigation and research.
出处
《人民黄河》
CAS
北大核心
2000年第12期10-11,共2页
Yellow River
关键词
除险加固
病险水库
防洪标准
淤积
黄河中游
risk elimination and solidification
reservoir in danger
flood prevention standard
sedimentation
Bajiazui reservoir
the middle Yellow River