摘要 提出一种兼容需求侧资源的负荷预测新方法,其基本思路为"自上而下细分负荷,自下而上叠加计算"。该方法的主要步骤为确定预测范围、对用户进行分类、识别各类用户的各种需求侧资源、定量分析预测期内各类用户各种需求侧资源对负荷的影响效果,通过多层次叠加技术测算得到预测区域内考虑需求侧资源的最大负荷。基于此,构建考虑需求侧资源的负荷预测模型。以某110 kV变电站中某条线路的覆盖范围为仿真算例,结果表明,考虑需求侧资源影响后电网规划中的负荷预测结果显著降低。 A method of load forecasting is proposed,which is compatible with the demand-side resources. Its basic idea is "top-down load subdividing and reverse calculating" and its main steps are as follows: determine the forecasting area;classify power consumers;identify the demand-side resources of different consumers;quantitatively analyze the impact of demand-side resources of different consumers on the load; with the consideration of demand-side resources,calculate the maximum load of forecasting area through multi-level stacking technique. The load forecasting model considering the demand-side resources is built. Simulation is carried out for a 110 kV substation feeder and results show that,with the consideration of demand-side resources,the load forecasted for grid planning is much lower.
出处 《电力自动化设备》 EI CSCD 北大核心 2013年第10期59-62,73,共5页 Electric Power Automation Equipment
关键词 需求侧资源 负荷预测 电网规划 模型 demand-side resource electric load forecasting grid planning models
  • 相关文献

参考文献15

  • 1KEANE A,TUOHY A,MEIBOM P,et al. Demand side resource operation on the Irish Power System with high wind power pe- netration[J]. Energy Policy,2011,39(5) :2925-2934.
  • 2JIA Wenzhao,KANG Chongqing,CHEN Qixin. Analysis on de- mand-side interactive response capability for power system dis- patch in a smart grid framework[J]. Electric Power Systems Re- search,2012,90 : 11-17.
  • 3JAMSHID A,MOHAMMAD-1MAN A. Demand response in smart electricity grids equipped with renewable energy sources:a review [J]. Renewable and Sustainable Energy Reviews,2013,18(2): 64-72.
  • 4MARMAN M,KAMEL F. Demand side response to mitigate elec- trical peak demand in Eastern and Southern Australia[J]. Energy Procedia,2011,12 : 133-142.
  • 5KARANGELOS E,BOUFFARD F. Towards full integration of demand-side resources in joint forward energy/reserve electricity markets[J]. IEEE Transactions on Power Systems,2012,27(1):280-289.
  • 6PEDRASA M,SPOONER T D,MACGILL I F. Scheduling of de- mand side resources using binary particle swarm optimization[J].IEEE Transactions on Power Systems,2009,24(3) : 1173-1181.
  • 7RAMANATHAN B,VITTAL V. A framework for evaluation of ad- vanced direct load control with minimum distruption[J]. IEEE Transactions on Power Systems, 2008,23 (4) : 1681-1688.
  • 8PALENSKY P,DIETRICH D. Demand side management:demand response,intelligent energy systems,and smart loads[J]. IEEE Transactions on Industrial hfformatics, 2011,7 (3) : 381-388.
  • 9龙虹毓,马建伟,吴锴,杨玉龙,张竞博,苏岭,仇斌5.含热电联产和风电机组的电网节能调度[J].电力自动化设备,2011,31(11):18-22. 被引量:41
  • 10梁甜甜,高赐威,王蓓蓓.智能电网下电力需求侧管理应用[J].电力自动化设备,2012,32(5):81-85. 被引量:53

二级参考文献125

共引文献217

同被引文献284

引证文献18

二级引证文献752

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部