工程项目群资源管理的HTCPN建模与优化 被引量:4

Modeling and Optimization of Resources Management of Construction Programme Based on HTCPN
原文传递
导出
摘要 资源有限性引起的项目间资源冲突是影响工程项目群建设周期和效益的重要因素。构建一个能够准确描述工程项目群实施全过程中任务关系、资源需求以及任务持续时间等资源管理相关信息的资源模型是进行工程项目群实施阶段过程管理和资源优化配置的关键。针对非消耗性资源的属性及工程项目群实施阶段资源管理的建模需求,基于HTCPN定义了工程项目群实施阶段资源模型。该模型能够准确描述工程项目群实施全过程,可以进行资源冲突发现、运行时间、资源计划方案优选的仿真分析。借助CPN Tools仿真平台,以某工程项目群实施阶段为例进行资源模型的构建和仿真,验证了基于HTCPN构建工程项目群实施阶段资源模型的正确性和有效性。 Resource conflict between the project caused by the limited resources is an important factor affecting the construction period and benefits of the construction programme. The building of an accurate model which can describe the information about resource man- agement, such as relations among tasks, resource requirements and task duration and so on is the key to the process management and optimal allocation of resources for implementation stage of construction programme. Resource model for implementation stage of construc- tion programme was defined based on HTCPN by analyzing the resource characteristics of non - depletable resources and the modeling requirements for implementation stage of construction programme. The model can accurately describe the whole process of programme, and also can find resource conflict, analyze the construction period and choose the optimal resource planning by simulation. With CPN Tools simulation platform, taking an example of a construction programme, the authors built its resource model and verified the correct- ness and effectiveness of the model.
出处 《控制工程》 CSCD 北大核心 2013年第5期984-989,共6页 Control Engineering of China
基金 国家自然科学基金项目(60872089) 四川省教育厅基金项目(08ZA023:10ZA188) 四川省高等学校重点实验室建设基金项目(SGXZD003-10-1) 西华大学重点科研基金项目
关键词 工程项目群 PETRI网 资源 建模 仿真 construction programme Petri net resource modeling simulation
  • 相关文献

参考文献9

  • 1Wakefield R R,G A Sears.Petri Nets for simulation and modeling of construction systems [J].Construction Engineering and Manage-ment,1997,123(2):105-112.
  • 2van der Aslst W M P.The application of petri nets to workflow management [J].The Journal of Circuits,Systems and Computers,1998,8(1):21-66.
  • 3oglekar N R,David N Ford.Product development resource allocation with foresight [J].European Journal of Operational Research.2005,160(1):72-87.
  • 4Zhang H.,Li H.,Lu M.Modeling time-constraints in construction operations through simulation [J].Journal of Construction Engineering and Management,2008,134(7):545-554.
  • 5Lu Ming,Hoi-Ching Lam,Fei Dai.Resource-constrained critical path analysis based on discrete event simulation and particle swarm optimization[J].Automation in Construction,2008,17(6):670-681.
  • 6Seungchul Ha,Hyo-Won Suh.A timed colored Petri nets modeling for dynamic workflow in product development process [J].Computers in Industry,2008,59(23):193-209.
  • 7胡文斌,乐宇,许龙,王凯凯,夏畅,杜博,宋伟.工期确定及可变工期下的受限资源多项目调度建模[J].计算机集成制造系统,2012,18(11):2398-2408. 被引量:4
  • 8满庆鹏,王要武,李晓东.基于Petri网的施工进度建模及优化方法[J].系统管理学报,2009,18(2):193-198. 被引量:8
  • 9陈春良,王岩磊,孙盛坤.HTCPN在装备保障业务流程建模与优化中的应用[J].系统仿真学报,2008,20(10):2746-2749. 被引量:22

二级参考文献45

共引文献30

同被引文献33

引证文献4

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部