期刊文献+

基于时变可靠度的全寿命系统维修模型研究 被引量:2

Research on Maintenance Model Based on Time-varying Reliability of Whole-life System
在线阅读 下载PDF
导出
摘要 针对在全寿命期内可进行多次维修的机械系统,提出了基于时变可靠度的维修决策基本模型,阐述了模型建立的前提、建模思想以及建模思路;提出了模型要解决的基本问题,包括系统维修间隔期计算、系统可靠度变化等重要问题;最后给出了模型的一个计算实例,编写了模型计算程序,并通过数据曲线拟合得到了主要维修性参数的近似函数表达式,从而验证了模型的可行性。 Abstract. Aiming at those mechanical systems which can carry on multiple maintenance in the whole life period, a basic maintenance decision model was put forward based on time--varying reliability of the system, and the precondition of establishing the model, the modeling thought and the basic ideas of the model were expounded. The basic problems the model was going to solve were also presented, including calculating the system maintenance intervals and the system reliability change, and other important problems. Finally, a calculation example was put forward, in which the model calculation program and the data curve fitting were done. In the calculation example, expressions of the system's maintainability parameters were obtained, which proves the feasibility of the model.
机构地区 东北大学
出处 《中国机械工程》 EI CAS CSCD 北大核心 2013年第18期2490-2494,共5页 China Mechanical Engineering
基金 国家自然科学基金资助项目(51175072) 高等学校博士学科点专项科研基金资助项目(20110042130003)
关键词 时变 可靠度 维修模型 维修间隔 time-- varying reliability maintenance model maintenance interval
  • 相关文献

参考文献11

  • 1Barlow R E, Proschan F. Mathematical Theory ofReliability[M]. New York:John Wiley, 1965.
  • 2Pierskalla W P,Voelker J A. A Survey of Mainte-nance Models : the Control and Surveillance of Dete-riorating Systems [J]. Naval Research LogisticsQuarterly, 1976,23:353-388.
  • 3Ciriaco V F,Feldman R M. A Survey of Preventive Maintenance Models for Stochastically Deteriorating Single--unit Systems[-J]. Naval Research Logistics Quarterly, 1989, 36:419-446.
  • 4Maintenance Models for Stochastically DeterioratingSingle—unit Systems[J]. Naval Research LogisticsQuarterly, 1989,36:419-446.
  • 5Cassady C R,Iyoop I M. A Generic Model of E-quipment Availability under Imperfect Maintenance[J]. IEEE Transaction Reliability, 2005 , 54 (4):564-571.
  • 6Lim J H,Park D H. Optimal Periodic PreventiveMaintenance Schedules with Improvement FactorsDepending on Number of Preventive Maintenances[J], Asia—Pacific Journal of Operational Research,2007, 24(1):111-124.
  • 7Das K,Lashkari R S,Sengupta S. Machine Relia-bility and Preventive Maintenance Planning for Cel-lular Manufacturing Systems [J]. European Journalof Operational Research, 2007 ,183 : 162-180.
  • 8Valdebenito M A, Schueller G I. Design of Mainte-nance Schedules for Fatigue—prone Metallic Com-ponents Using Reliability— based Optimization[J].Computer Methods in Applied Mechanics and Engi-neering, 2010,199:2305-2318.
  • 9Selvik J T,Aven T. A Framework for Reliabilityand Risk Centered Maintenance [J ]. Reliability En-gineering and System Safety, 2011,96 :324-331.
  • 10Liu N, Gao W S, Tan K X. Decision on Mainte-nance Period for Power Transformer based onMonte Carlo Simulation Reliability [C]//Proceed-ings of the 7th International Conference on Proper-ties and Applications of Dielectric Materials. Nago-ya,2003: 479-482.

同被引文献15

引证文献2

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部