摘要
本文探讨了厦门某项目地下室跳仓法施工,论述了本项目采用跳仓法施工时的两个仓块划分方案选择以及仓块的流水施工,在施工过程中,分仓缝的处理方法,混凝土施工的注意事项,以及跳仓法施工的应用所带来的显著效益和前景。
This paper discusses on alternative bay construction method about a project of Xiamen basement, discusses the two selection of divided bay scheme and flow construction. In the construction process, processing method of divided bay, matters needing attention in concrete construction, and the application of alternative bay construction method Institute to bring significant benefits and Prospects.
出处
《福建建筑》
2013年第9期58-60,共3页
Fujian Architecture & Construction
关键词
地下室施工
跳仓法
流水施工
Basement construction
Ahemative bay construction method
Flow construction