基于云驾岭矿在围绕岩巷掘进施工工程中,遇到的风锤打眼爆破、扒岩机装货、小罐罐车运输等方式制约岩巷掘进水平的问题,通过改进岩巷掘进中的钻孔和矸石装运方式,提高了岩巷单进水平,实现了岩巷掘进生产现代化,解决了岩巷快速施工的难题。
Based on Yunjialing mine surrounding rock roadway construction project, which encountered winds hammering blasting, pa rock machine loading, canister, etc. tanker transport constrainted rock roadway level, by improving the drilling rock heading holes and gangue shipping methods, the level of rock into a single lane was improved to achieve a rock roadway medemization of production, solving the problem of rapid construction of rock roadway.
出处
《煤炭与化工》
CAS
2013年第4期114-114,160,共2页
Coal and Chemical Industry
关键词
岩巷掘进
机械化
作业线
建设实践
rock drivage
mechanization
production line
construction practice