摘要
对水泥稳定碎石基层全厚式施工中的设备选型及关键技术进行研究,并提出该施工工艺中存在的问题及解决方法。工程实践表明,施工中只要控制好关键技术,水泥稳定碎石基层全厚式施工能够达到理想的效果。
The equipment selection and key techniques of full depth construction of cement stabilized macadam base were studied, and the problems and solutions in the construction process were put forward. The engineering practice shows that full depth construction of cement stabilized macadam base should achieve perfect results, if the key techniques were controlled well.
出处
《筑路机械与施工机械化》
2013年第9期63-65,共3页
Road Machinery & Construction Mechanization
关键词
水泥稳定碎石基层
全厚式施工
关键技术
设备选型
cement stabilized macadam base
full depth construction
key technique
equipmentselection