基于混沌粒子群算法的项目调度干扰问题研究 被引量:4

Research of project scheduling problems with disruption based on chaotic particle swarm algorithm
在线阅读 下载PDF
导出
摘要 针对资源受限项目调度问题中的干扰情况进行了界定,面向几种干扰问题建立了相应的资源受限项目调度干扰模型和混沌粒子群求解算法,对项目网络图干扰、任务干扰和资源干扰三种干扰问题进行仿真计算,验证了算法和模型的有效性,为决策者在干扰事件发生后及时对原最优调度计划作出调整给出了方向。 This paper defined the interference in the resource-constrained project scheduling problem (RCPSP) and estab- lished the corresponding resource-constrained project scheduling models and chaotic particle swarm algorithms for solving inter- ference of several questions. Simulation of the project network disruption, task disruption and resources disruption from the RCPSP has been done to verify the validity of the algorithms and models. And it shows the way for the decision makers how to adjust the original optimal scheduling scheme timely after the disruption events happened.
出处 《计算机应用研究》 CSCD 北大核心 2013年第9期2648-2655,2659,共9页 Application Research of Computers
基金 国家自然科学基金资助项目(71271138) 国家教育部人文社会科学规划基金资助项目(10YJA630187) 上海市教育委员会科研创新项目(12ZS133) 上海市一流学科建设项目(S1205YLXK)
关键词 项目调度 干扰管理 混沌粒子群算法 仿真 project scheduling disruption management chaotic particle swarm algorithm simulation
  • 相关文献

参考文献15

  • 1YU Gang.QI Xiang-tong. Disruption management:framework, models and applications [ M ]. Singapore: World Scientific Publishing Co. Pte. Ltd., 2004:1-50.
  • 2胡祥培,丁秋雷,张漪,王旭坪.干扰管理研究评述[J].管理科学,2007,20(2):2-8. 被引量:42
  • 3陈庭贵,琚春华.多干扰的资源约束项目调度问题[J].计算机集成制造系统,2012,18(11):2409-2418. 被引量:7
  • 4刘志霞.资源受限项目调度问题及其任务扰动的干扰管理研究[D].沈阳:沈阳工业大学,2011.
  • 5LAMBRECHTS O, DEMEULEMEESTER E, HERROELEN W. Time slack-based techniques for robust project scheduling subject to re- source uncertainty [ J ]. Annals of Operations Research, 2011,186 (1) :443-464.
  • 6KLIMEK M, LEBKOWSKI P. Resource allocation for robust project scheduling[J]. Bulletin of the Polish Academy of Sciences-Te- chinical Sciences,2011,59( 1 ) :51-55.
  • 7HAZIR O,HAOUARI M,EREL E. Robust scheduling and robustness measures for the discrete time/cost trade-off problem [ J ]. European Journal of Operational Research,2010,207(2) :633-643.
  • 8ZHU Z, BARD J F, YU G. Disruption management for strained project scheduling [ J ]. Journal of the Operational Re-search Society,2005,56(4) :365-381.
  • 9AL-FAWZAN M A, HAOUARI M. A bi-objective model for robust re- source-constrained project scheduling [ J]. International Journal of Production Economics,2005,96 (2) : 175-187.
  • 10KOLISCH R. Serial and parallel resource-constrained project schedu- ling methods revisited : theory and computation [ J ]. European Jour- nal of Operational Research, 1996,90 (2) z 320- 333.

二级参考文献63

共引文献57

同被引文献39

  • 1贺俊吉,张广军,杨宪铭.基于交比不变性的镜头畸变参数标定方法[J].仪器仪表学报,2004,25(5):597-599. 被引量:53
  • 2钟石泉,杜纲,贺国光.有顾客时间窗和发货量变化的紧急车辆调度研究[J].管理工程学报,2007,21(4):114-118. 被引量:14
  • 3Song Liming,Wu Wenfu,Guo Junrong,et al.Survey on camera calibration technique[C]//Proc of the 5th International Conference on Intelligent Human-Machine Systems and Cybernetics.2013:389-392.
  • 4Zhang Zhengyou.A flexible new technique for camera calibration[J].IEEE Trans on Pattern Analysis and Machine Intelligence,2000,22(11):1330-1334.
  • 5Weng J,Cohen P,Herniou M.Camera calibration with distortion models and accuracy evaluation[J].IEEE Trans on Pattern Analysis and Machine Intelligence,1992,14(10):965-980.
  • 6Modares H,Alfi A,Naghibi-Sistani M B.Parameter estimation of bilinear systems based on an adaptive particle swarm optimization[J].Engineering Applications of Artificial Intelligence,2010,23(7):1105-1111.
  • 7Dror M, Powell W. Stochastic and dynamic models in trans- portation[J]. Operations Research, 1993, 41(1 ) : 11-14.
  • 8Huisman D, Freling R, Wagelmans A P M. A robust solu- tion approach to the dynamic vehicle scheduling problem [J]. Transportation Science, 2004, 38(4): 447-458.
  • 9张浩,张铁男,沈继红,李阳.Tent混沌粒子群算法及其在结构优化决策中的应用[J].控制与决策,2008,23(8):857-862. 被引量:79
  • 10张靖,朱大勇,张志勇.摄像机镜头畸变的一种非量测校正方法[J].光学学报,2008,28(8):1552-1557. 被引量:35

引证文献4

二级引证文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部