期刊文献+

施工安全的可视化技术及应用 被引量:2

Visualization Technology for Construction Safety and Its Applications
在线阅读 下载PDF
导出
摘要 由于施工资源(人员、设备、材料)的数据十分庞大,对其收集、分析以至进行可视化操作较为复杂。近年来,随着远程数据传感器和智能数据处理技术的发展,在建筑施工中出现了一些数据可视化工具。本文从3个案例出发,分析建筑工程施工现场收集、记录数据与可视化管理的方法,提出了从实时定位传感器到实时数据可视化平台之间数据流传递的框架。结果表明:施工现场操作可以实现实时可视化,有利于建筑工程的科学管理,同时也极大可能避免事故的发生。 Data to field operations of construction resources including personnel,equipment and materials is vast,so the collecting,analyzing and visualization operating are difficult.With developments in remote data sensing and intelligent data processing supplement,some visualization tools in construction are produced.Based on three cases,data collecting and recording as well as visualization management method are analyzed.A novel framework is presented that explains the method of streaming data from real-time positioning sensors to a real-time data visualization platform.The results demonstrate that field operations can be automatically monitored and visualized in real time,thus offering benefits to scientific management of construction projects and avoid accidents.
出处 《施工技术》 CAS 北大核心 2013年第15期109-112,共4页 Construction Technology
关键词 施工安全 可视化技术 三维建模 影像传感器 construction safety visualization technology 3D modeling image sensors
  • 相关文献

参考文献11

  • 1A Hammad, H Wang, S P Mudur. Distributed augment reality for visualizing collaborative construction tasks [ J ]. ASCE Journal of Computing in Civil Engineering, Reston, 2005, 23 (6): 418-427.
  • 2T Cheng, M Venugopal, J Teizer, et al. Performance evaluation of ultra wideband technology for construction resource location tracking in harsh environments[ J]. Automation in Construction, 2012,20 (8) :1173-1184.
  • 3M Setareh, D Bowman, virtual reality structural Architectural Engineering G A Howell, G Ballard, A Kalita. Development of VSAP, a analysis system [ J ]. Journal of ,2005, 11 (4): 156-164.
  • 4T S Abdelhamid, et al. Working near the edge: a new approach to construction safety [ C ]// Proceedings of the lOth Annual Conf. of the International Group of Lean Construction. 2005.
  • 5J K Fernandes, V Raja, A White, et al. Adoption of virtual reality within construction processes: a factor analysis approach [ J]. Technovation, 2006, 26 ( 1 ) : 111-120.
  • 6J Messner, M Horman. Using advanced visualization tools to improve construction education [ C ]//Proc. in Conf. on Construction Applications of Virtual Reality ( CONVR ) Blacksburg. 2003.
  • 7D Huang, M Tory, S Sraub, et al. Visualization techniques for schedule comparison [ J]. Computer Graphics Forum, 2009, 28 (3) :951-958.
  • 8V K Bansal, M Pal. Generating, evaluating and visualizing construction schedule with geo-graphic information systems [ J ]. ASCE Journal of Computing in Civil Engineering, Reston, 2008, 22 (4) : 233-24-2.
  • 9V R Kamat, J C Martinez. Generic representation of 3D motion paths in dynamic animations of simulated construction processes [J]. Automation in Construction,2008, 17 (2) : 188-200.
  • 10P V Rekapalli, J C Martinez, V R Kamat. Algorithms for accurate three-dimensional scene graph updates in high speed animations of simulated construction operations [ J ]. Journal of Computer-aided Civil and Infrastructure Engineering, 2008, 24 (3) : 1-13.

同被引文献4

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部