摘要 采用实体退化单元精确描述构件几何特征,结合多尺度建模的思想建立杭州钱江八桥全桥精细有限元模型进行施工过程仿真分析.施工阶段仅考虑自重荷载,约束条件为多跨连续梁,最大顶推跨径为94m.分析结果表明:最大拉应力约为307.2MPa,最大压应力约为306.7MPa,均位于前导梁箱型截面段与双工字钢截面段的交接处,在施工过程中主桥结构未出现应力过大情形;主、副拱肋应力及变形呈现空间变化特性,截面角点应力的变化规律具有一定的对称性;主、副拱连杆对结构的受力有明显影响;主梁最大应力为-280.4MPa,施工中主梁未出现屈服现象. The construction of Hangzhou 8th Bridge on Qiantang River was simulated by fine finite element model. The degenerated solid element and multi-scale modeling were adopted. The structure was restrain- ed in boundary conditions of multi-span continuous beams. During construction, the largest launching span was 94 m, and self-weight was the only force considered. Simulation results showed that the largest ten- sion stress and compression stress, both occurred at the joint of the front nose and main beam of the south- ern span, were 307.2 MPa and 306.7 MPa, respectively. No overloading had happened. Stresses of main arch and subarch varied spatially and distributed symmetrically. The connecting rods significantly affected the structure stress. The main beam, stayed unyielding, bore a maximum compressive stress with the val- ue of --280. 4 MPa.
出处 《浙江大学学报(工学版)》 EI CAS CSCD 北大核心 2013年第7期1205-1212,共8页 Journal of Zhejiang University:Engineering Science
基金 国家自然科学基金资助项目(51108411) 浙江省自然科学基金资助项目(Y1110181) 重大工程结构安全防护与健康服役科技创新团队资助项目(2010R50034)
关键词 蝶形拱桥 顶推施工 实体退化单元 多尺度有限元模型 butterfly-arch bridge incremental launching degenerated solid element multi-scale finite ele-ment model
  • 相关文献

参考文献11

  • 1CHEN Bao-chun, WANG Ton-lo. Overiew of concrete filled steel tube arch bridges in China [J]. Practice Peri-odical on Structural Design and Construction, 2009, 14(2) : 70- 80.
  • 2LU Peng-zhen, ZHANG Jun-ping, ZHAO Ren-da. Study on the mechanical performance of butterfly arch bridge [J]. The Structural Design of Tall and Special Buildings, 2009, 18(5): 469-483.
  • 3SUN Yong, WANG Li-feng. Local stress analysis of the big intersection angle V-shaped pier of butterfly arch continuous girder bridge [C]//10th ICCTP - Integrated Transportation Systems: Green, Intelligent, Reliable. Beijing: [s. n. ], 2010:3453 -3462.
  • 4SASMAL S, RAMANJANEYULU K, SRINIVAS V, et al. Simplified computational methodology for analysis and studies on behaviour of incrementally launched con- tinuous bridges [J]. Structural Engineering and Mechan- ics, 2004, 17(2): 245-266.
  • 5徐兴,吴强,凌道盛,王建民.16—20结点三维退化层合板壳单元[J].浙江大学学报(自然科学版),2000,34(1):21-24. 被引量:4
  • 6LING Dao-sheng, YANG Qing-da, COX Brian. An augmented finite element method for modeling arbitrary discontinuities in composite materials [J]. International Journal of Fracture, 2009, 156(1): 53-73.
  • 7乔华,陈伟球.基于Arlequin方法的结构多尺度数值模拟[J].浙江大学学报(工学版),2010,44(12):2314-2319. 被引量:6
  • 8王春苗,李兆霞,殷爱国.大型土木结构多目标一致逼近有限元模拟方法[J].东南大学学报(自然科学版),2009,39(1):78-84. 被引量:3
  • 9林旭川,陆新征,叶列平.钢-混凝土混合框架结构多尺度分析及其建模方法[J].计算力学学报,2010(3):469-475. 被引量:55
  • 10LI Z X, ZHOU T Q, CHAN T H T, et al. Multi- scale numerical analysis on dynamic response and local damage in long-span bridges [J]. Engineering Struc- tures, 2007, 29(7): 1507-1524.

二级参考文献48

共引文献67

同被引文献46

引证文献4

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部