摘要
简要介绍了钻孔灌注桩、承台、墩柱及盖梁的施工要点,并对装配式预应力混凝土连续箱梁的预制和安装施工方案进行了论述,提出了施工注意事项,为今后类似工程施工提供了参考借鉴。
The paper briefly introduces the construction points for the bored piles,the bearing platform,the pier pile and bent caps,indicates the prefabricating and installation schemes for the fabricated prestressed concrete continuous box girder,and points out some construction precautions,so as to provide some reference for similar construction.
出处
《山西建筑》
2013年第25期189-191,共3页
Shanxi Architecture
关键词
预应力混凝土
箱梁
施工方案
prestressed concrete
box girder
construction scheme