摘要
围绕鹰手营子矿区采矿塌陷状况,利用常规D-InSAR技术获取监测数据,对该矿区的地表稳定性进行了分析,研究结果表明,汪家庄镇以南、以西区域为欠稳定区,汪家庄镇东北即拟建主厂区一带为基本稳定区。
Around the mine area mining subsidence situation of Yingshouyingzi,using conventional D-InSAR technology obtained monitoring data,analyzed the surface stability of mine area.The results indicate that the under-stable areas are in the south and west of Wangjiazhuang town,and that the basic stable areas are in the north-east of Wangjiazhuang town.The planning primary building area belongs to the basic stable areas.
出处
《山西建筑》
2013年第25期51-52,共2页
Shanxi Architecture