期刊文献+

现浇预应力混凝土连续箱梁施工工艺 被引量:11

The Construction Technology of the Continuous Pre-stressed Reinforced Concrete Box Girder
在线阅读 下载PDF
导出
摘要 现浇预应力混凝土箱梁是最近几年在铁路、公路和城市道路中最为常见的上部结构形式之一,其施工质量对整体结构至关重要.结合某立交桥现浇预应力混凝土连续箱梁具体实践,对现浇预应力混凝土连续箱梁的关键施工技术进行了论述,给出了各关键施工工序的具体处理措施,为现浇预应力混凝土箱梁的施工提供技术参考. The pre-stressed reinforced concrete box girder has been one of the most common structures on the railways,highways and urban roads in recent years,and the quality of construction directly affects the overall structure. Based on the construction practice of the pre-stressed reinforced concrete box girder of an overpass, the key construction technologies of the pre-stressed reinforced concrete box girder are discussed,the specific measures of key construction process and technical reference for the construction of pre-stressed reinforced concrete box girder are put forward.
出处 《河南科学》 2013年第7期1031-1035,共5页 Henan Science
关键词 现浇 混凝土 预应力箱梁 施工工艺 cast-in-place concrete pre-stressed reinforced box girder construction technology
  • 相关文献

参考文献2

共引文献32

同被引文献39

引证文献11

二级引证文献26

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部