期刊文献+

工程局部结构改造中钢管脚手架的附墙和防护 被引量:5

WALL ATTACHMENT AND PROTECTION OF STEEL TUBULAR SCAFFOLD IN LOCAL STRUCTURE REBUILDING ENGINEERING
在线阅读 下载PDF
导出
摘要 常规施工中,钢管脚手架的搭设是随着建筑物的升高而升高的,并依据建筑物外轮廓和施工要求,事先确定内立杆到建筑物的距离,安全度高。而在已完工程的局部改造中,脚手架应按改造后的建筑物外轮廓进行搭设,而附墙须在原有建筑结构上进行。当建筑物外轮廓变化时,或当脚手架附着点的结构拆除后,会造成纵横向附墙距离或附墙杆成倍加大的问题。对此,探讨在局部结构改造中,为保证脚手架安全使用,脚手架的搭设、附墙的设置方法等。 During routine construction, the height of steel tubular scaffold increases when building height increases and the distance from the internal tube to the building and safety height are determined in advance according to the building profile and construction requirements. During local rebuilding of finished project, the scaffold shall be erected according to the profile of rebuilt building, and attaching wall must be constructed on the original building structure. When building profile changes or when the structure on which the scaffold is attached to, the distance of longitudinal and transverse attaching walls or attaching wall tube may be doubled. Therefore, the setting method of scaffold erection and attaching wall are discussed in local structural rebuilding, so as to guarantee the safe application of scaffold.
出处 《建筑技术》 2013年第8期720-722,共3页 Architecture Technology
关键词 脚手架 稳定性 外挑 拉结 封闭 置换 scaffold stability cantilever pulling node close displacement
  • 相关文献

参考文献5

  • 1JGJl30--2001,建筑施工扣件式钢管脚手架安全技术规范[S].
  • 2GB50205--2001,钢结构工程施工质量验收规范[S].
  • 3DG/T08-016-2004J10374-2004,钢管扣件水平模板的支撑系统安全技术规程[s].
  • 4GB50009--2001,建筑结构荷载规范[S].
  • 5周法献.附着升降脚手架应用技术创新[J].建筑技术,2012,43(8):692-694. 被引量:8

二级参考文献3

共引文献72

同被引文献16

引证文献5

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部