既有建筑物工作性状受盾构隧道施工影响研究 被引量:16

Study on the Behaviors of an Existing Building Influenced by Adjacent Tunnelling
在线阅读 下载PDF
导出
摘要 针对盾构隧道近接既有多层框架结构建筑物施工工况,通过构建考虑隧道-土体-建筑物共同作用的3维有限元模型,对盾构隧道开挖引起的建筑物楼面扭曲变形及框架柱轴力进行了系统的敏感性因素分析。研究结果表明:盾构隧道施工导致位于建筑物角部的梁柱节点出现应力集中,且该建筑物对周边地面沉降存在一定约束作用;隧道开挖会导致其左侧3维建筑物楼面产生顺时针扭曲变形;当隧道开挖面推进至建筑物且尚未穿越其横向中心时,楼层扭曲变形增大、框架柱轴力下降,当开挖面到达并超过建筑物横向中心后,楼层扭曲变形及柱轴力的变化趋势与前述刚好相反。研究成果有助于更好地评估地面既有框架结构建筑物因隧道开挖导致的破坏效应。 In order to investigate the building floor’s twist and the frame column’s axial force due to shield tunnelling adjacent an existing multistory frame structure building,several typical sensitive factors were analyzed through the 3D FEM by considering the interaction of the shield tunnel,heterogeneous soil and existing building.The result showed that the stress concentration caused by shield tunnelling appears just at beam-column joints of the building corner,and the tunnelling-induced ground settlement will be restricted by the surrounding existing building.The clockwise rotation of the left-side building floor is caused by shield tunnelling.Before the tunnel excavation face promotes to the transverse centerline of the building,the twist of the building floor increases,while the axial force of the frame column decreases.However,the opposite results were calculated as the shield driving.The analytical results can be used to better assess building responses to tunnel excavation induced ground settlement.
出处 《四川大学学报(工程科学版)》 EI CAS CSCD 北大核心 2013年第4期69-75,共7页 Journal of Sichuan University (Engineering Science Edition)
基金 国家自然科学基金资助项目(51278099) 住房城乡建设部科学技术资助项目(2012-K3-35)
关键词 盾构隧道 既有建筑物 共同作用 3维有限元 敏感性因素 扭曲变形 轴力 shield tunnel existing building interaction 3D FEM sensitive factor twist axial force
  • 相关文献

参考文献12

  • 1Potts D M, Addenbrooke T I. A structure' s influence on tun- neling-induced ground movements [ J ]. Proceedings of the Institution of Civil Engineers, Geotechnical Engineering, 1997,125(2) :109 - 125.
  • 2魏纲,裘新谷,魏新江,丁智.邻近建筑物的暗挖隧道施工数值模拟[J].岩土力学,2009,30(2):547-552. 被引量:34
  • 3Akhaveissy A H. Analysis of tunnel and super structures for excavation[ J ]. Scientia Iranica A,2011,18( 1 ) :1 -8.
  • 4Burd H J, Houlsby G T, Augarde C E, et al. Modelling tun- neling-induced settlement of masonry buildings[ J ]. Proceed- ings of the Institution of Civil Engineers, Geotechnical Engi- neering,2000,143 : 17 - 29.
  • 5Mroueh H, Shahrour I. Three-dimensional finite element a- nalysis of the interaction between tunneling and pile founda- tion[ J ]. International Journal for Numerical and Analytical Methods in Geomechanies,2002,26 : 217 - 230.
  • 6Liu J F, Qi T Y, Wu Z R. Analysis of ground movement due to metro station driven with enlarging shield tunnels under building and its parameters sensitivity analysis[ J. Tunneling and Underground Space Technology,2012,28:287 - 296.
  • 7Chungsik Y, Kim J H. A web-based tunneling-induced build- ing/utility damage assessment system: TURISK [ J ]. Tunnel- ling and Underground Space Technology, 2003,18 : 497 - 511.
  • 8侯艳娟,张顶立.浅埋大跨隧道穿越复杂建筑物安全风险分析及评估[J].岩石力学与工程学报,2007,26(S2):3718-3726. 被引量:49
  • 9张在明,韩煊.城市隧道施工引起建筑物变形的损坏评估[J].土木工程学报,2011,44(5):123-130. 被引量:24
  • 10韩德元.地铁盾构施工对邻近建筑物的影响研究[D].辽宁:辽宁工程技术大学,2010.

二级参考文献36

共引文献102

同被引文献134

引证文献16

二级引证文献102

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部