摘要
针对当前桥梁地震时程反应分析中 ,只重视计算方法、计算模型的研究 ,忽视输入地震波的情况 ,研究了进行时程分析时 ,确定输入地震波的原则和方法 ,推荐了
In the current bridge seismic time history analysis, much attention has been paid to the study of calculation methods and analysis models, while the introduction of seismic waves is always neglected. In this paper, the principles and methods for determining seismic waves to be introduced into the time history analysis are studied. 3 kinds of considerably reasonable methods for determining the seismic waves needed in the analysis are recommended.
出处
《桥梁建设》
EI
CSCD
北大核心
2000年第3期1-4,共4页
Bridge Construction