摘要
以深水铺管起重船"海洋石油201"为背景,介绍自动压载系统及其在配合主起重机工作时的流程。针对实际应用中遇到的问题从理论上进行分析,并对其系统缺陷提出改进方案。
Based on the deepwater pipelaying vessel " Haiyang-Shiyou 201" , the auto ballast system and process with the main crane was introduced. The problems happened in practical use were analyzed theoretically to put forward the improved plan for the defect of the auto ballast system.
出处
《船海工程》
2013年第3期73-75,78,共4页
Ship & Ocean Engineering
关键词
深水铺管起重船
自动化控制
自动压载
deepwater pipelaying vessel
automatic control
auto ballast