期刊文献+

鸭子荡水库二次加坝后渗流问题的有限元计算

Seepage finite element calculation after raising the homogeneous earth dam of Yazidang reservoir
在线阅读 下载PDF
导出
摘要 土石坝的扩建加高一般采用下游面培厚加高的方法,加高后的渗流稳定问题是工程安全与否的关键.由于土坝加高后新老土体的渗透性不同,易造成坝体渗透的不均匀性,引起渗透破坏.采用有限元方法,就3种加坝方案,从坝体和坝基各向同性与各向异性2个方面,对均质土坝的稳定渗流问题进行了研究,比较了各个方案的优劣,选取最佳方案. Raising and thickening earth dam at downstream face is common method for dam expansion and heightening.The problem of seepage stability is the safety key of the project after raising the earth dam.Since the new earth body and the old one have different permeability,and it is easy to lead to unequal seepage and seepage destroy.By using finite element method,problem of homogeneous earth dam seepage stability is studied and analyzed on isotropic and anisotropic aspects of dam body in three dam schemes.Then,best scheme is selected by comparison.
作者 朱焱
出处 《宁夏工程技术》 CAS 2013年第2期134-137,共4页 Ningxia Engineering Technology
关键词 土坝 扩建 渗透稳定性 有限元分析 earth dam expansion seepage stability finite element analysis
  • 相关文献

参考文献4

  • 1赵婷,孙其龙.均质土坝加高后渗流有限元计算[J].黑龙江水专学报,2006,33(3):26-29. 被引量:2
  • 2黄河水利委员会勘测规划设计研究院.碾压式土石坝设计规范SL274-2001[S].北京:中国水利水电出版社,2002:78-84.
  • 3顾慰慈.土石(堤)坝设计计算手册[M].北京:中国建材工业出版社,2006.
  • 4钱家欢.土工原理与计算[M].北京:中国水利水电出版社,1982.

二级参考文献3

  • 1SL 237-99,土工试验规程[S].
  • 2临汾市水利勘测设计院.浍河水库除险加固项目初步设计报告[R].临汾:临汾市水利勘测设计院,2004,
  • 3毛昶照.渗流计算分析与控制[M].北京:水利电力出版社,1990.

共引文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部