1言茂松(Yan Maosong). 当量电价与融资重组.(Electricity Value Equivalent Pricing and Restructuring). 北京:中国电力出版社(Beijing:Chinese Electric Power Press),2000.
2Wu R N, Lee T H, Hill E F. An Investigation of the Accuracy and the Characteristics of the Peak-shaving Method Applied to Production Cost Calculations. IEEE Trans on Power Systems,1989, 4(3): 1043~1049.