基于Petri网和UML的钢厂天车调度系统仿真 被引量:8

Simulation of Crane Scheduling Systems for Steel Plant Based on Petri Nets and UML
在线阅读 下载PDF
导出
摘要 天车调度是钢铁生产自组织复杂系统中各生产工艺匹配和协调运行的关键.针对天车调度任务繁杂及随机性的特点,利用UML面向对象建模语言,对天车调度系统进行剖析,并建立系统的需求分析模型、静态模型和动态模型,讨论了天车调度系统各模型实现机制.为弥补UML建模语言形式化表达不足,引入形式化建模工具Petri网建立系统的Petri网模型,并对系统Petri网模型进行静态和动态分析,来有效指导天车调度系统UML语言建模.仿真结果表明:建立的钢铁生产天车调度系统能有效模拟天车调度,并减少天车的被动运输,提高天车运行效率3%左右. Crane scheduling is the key to matching production process and coordinating task in self- organizing complex systems. According to the task complexity and randomness in crane scheduling systems, the requirement model, static model and dynamic model are built by UML. Then the internal implementation mechanism is dis- cussed. Aiming at making up the deficiency of formal expression by UML modeling language, Petri nets are in- troduced to establish the system model to effectively guide the UML modeling process in crane scheduling sys- tems. Simulation results show that the crane scheduling system can complete scheduling task of the steel - mak- ing and continuous casting as well as reduce the passive transport time. The operating efficiency of crane from the system is about 3% higher than that in a practical process.
出处 《昆明理工大学学报(自然科学版)》 CAS 北大核心 2013年第3期5-11,共7页 Journal of Kunming University of Science and Technology(Natural Science)
基金 国家自然科学基金项目(61064010) 云南省自然科学基金资助项目(2008ZC007M)
关键词 PETRI网 天车调度 系统仿真 统一建模语言 Petri Nets crane scheduling system simulation UML
  • 相关文献

参考文献16

  • 1殷瑞钰.钢铁制造流程的解析和集成[J].金属学报,2000,36(10):1077-1084. 被引量:26
  • 2郑忠,徐乐,高小强.基于元胞自动机的车间天车调度仿真模型[J].系统工程理论与实践,2008,28(2):137-142. 被引量:35
  • 3Azadeh A, Maghsoudi A. Optimization of production systems through integration of computer simulation, design of experiment, and Tabu search: the case of a large steelmaking workshop[J]. InternationalJournal of Advanced Manufacturing Technology , 2010,48(5 -8): 785 -800.
  • 4何腊梅,郑忠,高小强,赵克文,张大德,陈小平.攀钢炼钢生产物流仿真分析[J].重庆大学学报(自然科学版),2004,27(5):57-61. 被引量:14
  • 5Shengping Yu , Ruixia Lv, Binglin Zheng, et al. Simulation system for logistics in steelmaking process based on Flexsim[CJ . 2009 Chinese Control and Decision Conference, 2009: 3741 - 3746.
  • 6陈吉人,陈文明,苏冬平.物流仿真技术在炼钢连铸调度计划中的应用[J].宝钢技术,2006(B11):47-50. 被引量:6
  • 7蒋胜龙,郑忠,高小强,何腊梅.基于UML的炼钢物流仿真系统分析与设计[J].系统仿真学报,2007,19(16):3676-3679. 被引量:12
  • 8Tanizaki T, Tamura T, Sakai H. A heuristic scheduling algorithm for steel making process with crane handling[J].Journal of the Operations Research Society ofJapan ,2006, 49 (3): 188 - 20l.
  • 9Lim A, Rodriguez B, Xiao F, et al. Crane scheduling using tabu search[CJ. Proceedings of the 14 th IEEE International Conference on Tools with Artificial Intelligence, 2002: 146 -153.
  • 10Peng Liu, Lixin Tang. The refining scheduling problem with crane non - collision constraint in steelmaking process[CJ . 2008 IEEE International Conference on Automation and Logistics, 2008: 536 - 54l.

二级参考文献49

共引文献83

同被引文献95

引证文献8

二级引证文献39

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部