摘要
笔者根据近年来从事许多桥梁基桩设计的经验 ,结合商开高速公路的基桩施工情况 ,针对不同的地质条件和问题桩的实际缺陷程度 。
The author according to self experiences of doing mang designs for bridge foundational pile in recent years,combines with the construction condition of foundational pile in ShangKai Expressway,is directed against different geological conditions and concrete defective extent of the problematical pile,introduces several kinds of handling schemes of the defective drilling hole pour pile in ShangKai Expressway.